1.6 KiB
1.6 KiB
Implementation Docs
This folder drives the implementation work for the pi-remote iOS app and
its sidecar. Background / spec / audit material lives in
reference/.
Start here when resuming work: NEXT-STEPS.md.
| File | Purpose |
|---|---|
NEXT-STEPS.md |
Resume pointer — state of play, next orchestrator actions, open questions. Read first. |
PHASE-0-spike-stream.md |
Stream PoC — verify tmux + pipe-pane + WebSocket. ~1 day, single agent. Done, see reference/PHASE-0-report.md. |
PHASE-0.5-spike-tmux-control-mode.md |
Follow-up spike: tmux control mode (-CC) vs pipe-pane + watchdog. Decides Phase 1 streaming path. ~2h, single agent. |
PHASE-1-sidecar.md |
Sidecar production-ready: all S-features, multi-agent parallel work. Blocked on Phase 0.5. |
PHASE-2-ios-mvp.md |
iOS app MVP — Groups A, B, C-01/02, D, E, F. Multi-agent parallel. |
PHASE-3-ios-augmentation.md |
iOS feature polish — slash palette, voice, thumbnails, search, etc. |
SYNC.md |
Live multi-agent coordination — claims, file ownership, contract changes. |
Order of work
- Phase 0 first, single agent.
- Phase 1 starts after Phase 0 green-lights; multi-agent parallel.
- Phase 2 starts after Phase 1 is production-ready; multi-agent parallel.
- Phase 3 is continuous after Phase 2 MVP ships.
See SYNC.md for the current state.