- Add PHASE-0-report.md with full analysis - All acceptance criteria (R-1 to R-5) validated - Verdict: GREEN LIGHT for Phase 1 - Critical finding: pipe-pane reliability issue - Recommendation: use node-pty in Phase 1 - Update SYNC.md: Phase 0 done, Phase 1 ready to start - Remove active claim, add history entry |
||
|---|---|---|
| .. | ||
| ARCHITECTURE.md | ||
| EXTENSION-API-AUDIT.md | ||
| PHASE-0-report.md | ||
| README.md | ||
| SPEC-ios-app-review-v1.md | ||
| SPEC-ios-app.md | ||
README.md
Reference Documents
Background and design artefacts. The implementation work is driven by the
phase plans in the parent docs/ directory.
| File | Purpose |
|---|---|
SPEC-ios-app.md |
Final spec v3 for the iOS app and sidecar. The source of truth for what is being built. |
EXTENSION-API-AUDIT.md |
Audit of pi's ExtensionAPI — what's exposed, what's not, workarounds. Drives the realisability of S-07, S-08 and similar. |
SPEC-ios-app-review-v1.md |
Archived review thread of spec v1 → v2 with inline discussions. Historical, do not edit. |
ARCHITECTURE.md |
Original architecture document for the existing pi-remote-control extension (HTML/WebSocket client). |