# Next Steps — Resume Pointer > **Last updated:** 2026-05-15. > **Where we are:** Phase 1 complete. All T-1.0..T-1.10 implemented + smoke 12/12 green. > **Where we go next:** Phase 2 — iOS MVP. Blocked on Phase 1 being stable; unblock in SYNC.md. This document is the "where did I leave off" anchor. Read this first when resuming work. The rest of `docs/` is reference. --- ## State at end of session | Item | Status | |---|---| | Phase 0 — Stream Spike | ✅ done. Verdict GREEN with caveat (pipe-pane unreliable). Branch `feat/spike-stream` kept. | | Phase 0.5 — Control-Mode Spike | ✅ done. Verdict: **Path B — tmux control mode**. Branch `feat/spike-tmux-cc` kept. | | Phase 1 plan | ✅ updated to Path B. T-1.1 now specifies control mode + `%output` parser. Architecture diagram, risks (R4 + R5) added. | | Interface Contracts (IC-1..IC-4) | ✅ **frozen** 2026-05-15. See SYNC.md. | | Phase 1 implementation | ✅ **done** 2026-05-15. All T-1.0..T-1.10 on main. Smoke 12/12. | | iOS work | blocked, untouched. | Branches on remote `git.vpsj.de/jay/pi-remote-control`: - `main` — has all docs, no implementation changes yet. - `feat/spike-stream` — Phase 0 PoC, throwaway. - `feat/spike-tmux-cc` — Phase 0.5 PoC, throwaway. Reference impl for T-1.1. --- ## Orchestrator todo list (in order) These are things only the orchestrator does — not delegatable to a worker subagent. ### 1. Freeze interface contracts Open `PHASE-1-sidecar.md` §Interface Contracts and re-read IC-1..IC-4. For each: does it still look right after the spikes? Anything to tweak? Things to double-check: - **IC-1 ClientToServer**: do we want to add `{ type:"resize"; cols:int; rows:int }` so iPad-Landscape can renegotiate tmux pane size? (Spec said fixed 120×40, but if we ever want elastic, this is the place.) Recommendation: defer, fix at 120×40 for v1, revisit only if it bites. - **IC-1 ServerToClient**: `tree` event — gruppe T is out of iOS scope, so this can be dropped from the contract OR kept as "reserved, server may emit but client ignores". Recommendation: drop to keep contract tight. - **IC-2 REST shape**: `/sessions/:id/thumbnail` is referenced by iOS-D-01c (Phase 3). Should the endpoint return raw text/plain capture, or a structured JSON `{cols,rows,lines:[…]}`? Recommendation: raw text/plain — simpler, smaller, client parses lines itself. - **IC-3 pairing**: `deviceToken` and `environment` are now mandatory in Phase 2. Pre-Phase-2 they're optional. Mark accordingly. - **IC-4 TOML config**: `[apns]` section can have an `environment_default` for testing convenience? Probably no — environment is per-device. Leave as-is. After review: - Edit `SYNC.md` "Frozen Interface Contracts" table: set Status `frozen` and fill `Frozen at` date. - Commit on main. ### 2. Dispatch T-1.0 — Server Refactor Single agent, blocking everyone else. Refactor existing `extensions/remote-control/server.ts` (335 lines) and friends into the modular layout from `PHASE-1-sidecar.md` §Architecture Sketch. Prompt template (adapt with concrete contract numbers): ``` # Task: Phase 1 T-1.0 — Server Refactor Working dir: /Users/jay/.pi/agent/git/git.vpsj.de/jay/pi-remote-control Read first: - docs/NEXT-STEPS.md (state of play) - docs/PHASE-1-sidecar.md §Architecture Sketch and §Task Breakdown row T-1.0 - docs/SYNC.md (claim the task) - existing code: extensions/remote-control/{index,server,html,messages,auth,config}.ts Goal: - Carve existing server.ts into the server/ + server/routes/ + server/upgrade.ts structure from the phase doc. - Keep the LEGACY HTML client (html.ts) working end-to-end. Add comments tagging these legacy paths. - No new features. No new endpoints. Just structural refactor + ensure existing tests / smoke usage still works. - After your refactor lands, the directory layout matches the Phase-1 Architecture Sketch. Out of scope: anything touching tmux/, buffer/, pi/, auth/{pairing,tls}.ts, apns/, cli/. Those are for later T-1.* tasks. Branch: feat/p1-t1-0-server-refactor ``` After T-1.0 merges into main, the parallel fan-out becomes available. ### 3. Plan the parallel fan-out Once T-1.0 is in main: - 5 worker dispatches in parallel: T-1.1, T-1.2, T-1.3, T-1.4, T-1.10. - Each gets a tight prompt referencing their row in `PHASE-1-sidecar.md` and the relevant frozen ICs. - T-1.1 explicitly says: use control mode, reference `spike-cc.ts` on `feat/spike-tmux-cc`, follow R-CC-1..R-CC-5 expectations. T-1.5, T-1.6, T-1.7 follow as their deps come in. --- ## Reading order for resumption 1. `docs/NEXT-STEPS.md` (this file) 2. `docs/SYNC.md` — current claims, gate, contracts 3. `docs/PHASE-1-sidecar.md` — what to build 4. `docs/reference/PHASE-0-report.md` and `PHASE-0.5-report.md` — why we're building it this way 5. Spec only if you forget the why: `docs/reference/SPEC-ios-app.md` --- ## Open questions for next session - ~~**OQ-1.** Drop the `tree` event from IC-1 ServerToClient~~ — **resolved**: dropped. IC-1 frozen 2026-05-15. - ~~**OQ-2.** Resize message in IC-1?~~ — **resolved**: deferred, fixed 120×40 for v1. - ~~**OQ-3.** tmux control-mode connection per-server vs per-session?~~ — **resolved**: per-session (like the spike). Simpler, spike reference code exists, isolates parser state per session. Refactor to per-server later if scale demands it. - ~~**OQ-4.** Worker model for T-1.0?~~ — **resolved**: `anthropic/claude-sonnet-4-6` with `context: fresh`. Haiku rejected: previous swarm attempt produced broken imports across `index.ts`/`html.ts`/`messages.ts` even on a stronger model (see deleted `feat/p1-t1-0-server-refactor` branch). T-1.0 is the blocker for all parallel fan-out — reliability over cost. --- ## Don't do tomorrow - Don't merge the spike branches into main. They're reference, not code. - Don't start T-1.1 before T-1.0 is in main. - Don't start any iOS task until Phase 1 is at least feature-complete. - Don't expand scope. Stick to v3 spec; new ideas go into a v4 review round, not into open PRs.