# Implementation Docs This folder drives the implementation work for the pi-remote iOS app and its sidecar. Background / spec / audit material lives in [`reference/`](./reference/). | File | Purpose | |---|---| | [`PHASE-0-spike-stream.md`](./PHASE-0-spike-stream.md) | Stream PoC — verify tmux + pipe-pane + WebSocket. ~1 day, single agent. **Done**, see `reference/PHASE-0-report.md`. | | [`PHASE-0.5-spike-tmux-control-mode.md`](./PHASE-0.5-spike-tmux-control-mode.md) | Follow-up spike: tmux control mode (`-CC`) vs pipe-pane + watchdog. Decides Phase 1 streaming path. ~2h, single agent. | | [`PHASE-1-sidecar.md`](./PHASE-1-sidecar.md) | Sidecar production-ready: all S-features, multi-agent parallel work. Blocked on Phase 0.5. | | [`PHASE-2-ios-mvp.md`](./PHASE-2-ios-mvp.md) | iOS app MVP — Groups A, B, C-01/02, D, E, F. Multi-agent parallel. | | [`PHASE-3-ios-augmentation.md`](./PHASE-3-ios-augmentation.md) | iOS feature polish — slash palette, voice, thumbnails, search, etc. | | [`SYNC.md`](./SYNC.md) | Live multi-agent coordination — claims, file ownership, contract changes. | ## Order of work 1. Phase 0 first, single agent. 2. Phase 1 starts after Phase 0 green-lights; multi-agent parallel. 3. Phase 2 starts after Phase 1 is production-ready; multi-agent parallel. 4. Phase 3 is continuous after Phase 2 MVP ships. See `SYNC.md` for the current state.